Document Type

Lesson Plan

Publication Date

10-29-2004

Abstract

To model equations that are used everyday by construction sales people to compute the cost of a job. To have students be able to construct models that represent real world problems in engineering, and determine a valid answer.

Comments

Questions, comments or suggestions about this model may be sent to:
Dr. Leigh Little, The College at Brockport

TI_Plan_Demond_Thomas.zip (14 kB)
Contains lesson plan and any application files

Tools used

TI calculator

Grade Level

7-9

Share

COinS